Posted on February 24th, 2010 by johns-admin-dw | Comments Off on Ground works
You can see in the picture a large black pipe this is used to pump the concrete in the footings.The pump can deliver the concrete some 100meters from the foundations.Saves a lot of time and labour this way.
Posted on February 24th, 2010 by johns-admin-dw | Comments Off on Beam installation
On this project we are installing the floor beams prior to the building inspectors inspection .This is one of many stages .
Posted on February 24th, 2010 by johns-admin-dw | Comments Off on Extention
We are at this present time installing a new toilet for a customer in this extention that was undertaken some 6 weeks ago .
Posted on February 24th, 2010 by johns-admin-dw | Comments Off on Garage convertion
A small extention under way and will be shorty finished .This was a garage convertion and is being carried out in Southend on Sea Essex .Many peaple are having this type of convertion .
Posted on February 24th, 2010 by johns-admin-dw | Comments Off on Conservatory base
A large conservatory base 5m 3.5m we matched the house bricks to complement the build .This work was in Colchester Essex works was completed in one week .
Posted on February 24th, 2010 by johns-admin-dw | Comments Off on New build
here we have a new build under way and near completion we should be on target for a 13 week completion if any one can john cann
Posted on February 24th, 2010 by johns-admin-dw | Comments Off on Extention essex
There a stages of every job when the site looks like a bomb has gone of but rest assured it always turns out fine
Posted on February 24th, 2010 by johns-admin-dw | Comments Off on Drive way
Another drive way under construction from johns brickwork ltd We used the old paving and pointed it in and it looks great .
Posted on February 24th, 2010 by johns-admin-dw | Comments Off on New build fire place
Another fire place built for a customer in a new build all works carried out by johns brickwork ltd
Posted on February 24th, 2010 by johns-admin-dw | Comments Off on Under ground pipe work
This project needed a soak/away for the surface water from the guttering .All works are then inspected by the local building inspector as was this and passed.