The new year
Hi there and i hope you all had a great Christmas and a fantastic new year .There is existing new happening in the company with the start of a new extension in Essex as we start a double story in Stock .It is half brick and block work construction followed with a timber floor upper .
We have started placing the block and mess fencing around the house inside the enclosure we will place our site hut ie a large garden shed nothing fancy but it as a site hut and keeps the rain of .
We have the plans for the complete build there so that all the necessary trade can look in to take there measurements for their works and collect there materials from there as well.In time we will be connecting up to the power sully as soon as the old sparky is on site .We will keep you all posted with the progress of the works .The next stage is the footing and they will be excavated with a digger and the footing are about around 1 meter deep and 500mm wide .
They will be back filled with c30 concrete this is designed for a double story extension and Carry’s a 10 year guarantee we will pump the concrete in via a large concrete pump lorryWe are Essex Builder