Southend on sea
Welcome back to Jones brickwork blog some very interesting major works are being carried out in Southend-on-Sea lets start with the all the improvements at the airport . Works carried out the airport are to extend a number of runways this is to cater for longer journeys and further destinations will be reached due to these works along with the construction of the new look at tower absolutely fantastic modern attractive design of course this will replace the old one was built to the airport for new.
Part of the works consists of a new railway station there this present time in moment as we speak is under construction platforms already installed a new signals along the line this of course will stop the new railway station to Southend-on-Sea April works are carried out will benefit the local surrounding community is a long time coming the rejuvenation of the airport hopefully in time local residents will see the benefits of this.
We also have under my major works being carried out to local arterial roads leading into Southend-on-Sea this is busy introduction of wider lanes and safety cameras and traffic lights all the works are being carried out these into the no Southend-on-Sea shopping centres the old underground bus station has now become redundant is a service drop for delivery drivers to local stores above Main Street high-street repairs are still being carried out-these will be completed and finished proper for this Christmas.
The introduction of the new swimming pool is very near completion and will benefit all of us in the town and sourounding area